Our customer develops quality control installations for glass products. To keep the different articles in the right position during verification they used a conventional, time consuming fixing method.
Customer needs
- They are looking to improve the necessary time to change the conventional solution during after-sales operations.
- Avoid the risk of loosing components in the production line. So, they expressed a need to simplify the assembly method (3 different components were used).
- Cost – reduction: installation time and component price
Clufix expertise
Our development team worked with the customers R&D in order to develop together an unique fastener which is completely integrated in the quality control machine. On and off-site testing validated our approach and solution.
Results
-
The necessary time for after sales interventions is reduced with more than 50 % and the customer can work more autonomous on his installation.
-
No more loose parts, so no more risk in damaging surrounding equipment by losing components.
This case study inspires you, having a similar project ?
Contact us